We work with multiple yards and vessel owners in the Asia Pacific, to provide limitless options for our customers.
Platform Supply Vessel (PSV)
Anchor Handling Tug Supply (AHTS/AHT)
Accommodation Work Barge (AWB)
Fast Crew Boat (FCB)
Tug and Barge
We provide:
Sales and Purchase
Chartering
New Build
Platform Supply vessel
PSV are designed for transportation of cargo to and from offshore oil platform and other offshore structure. The vessels can carry a combination of deck cargo and bulk cargo in tanks below deck. The vessels are equipped with firefighting capability and DP system
Class: ABS + A1 (E), Offshore Support Vessels, (Supply, FFV 1, OSR-C2) + AMS + ACCU + DPS-2, SPS
Length: 78M
Draft: 6.35M
Dead weight: 4,000T
Year Built: 2015
Clear Deck Space: 750m2
Delivery: Malaysia/Singapore/China depends on order.
Accommodation Work Barge/Vessel
AWB ranges from 150 pax to 300 pax equipped with a 300T Crane.
Class: ABS + A1 Barge, Accommodation & Work Barge Built to MODU Code
Length: 10M
Depth Moulded: 6.50M
Mooring System: 8 Point Mooring System, 4 x Double Drum AMHOIST AM77EF Diesel Driven Winches c/w spooling devices and tension meters.
Main Diesel Generators: 6 x 2800kw
Thruster: 4 x 560kw, 440/3/50
Crane: Pedestal Mounted - AMCLYDE Unit Mariner Model 35000 - Lifting Capacity 70T at 15m Radius, 150ft boom, 30ft above deck
Auxiliary Crane: 10T at 30ft radius
Clear Deck Space: 1728sqm2
Accommodation: 300 pax
Helicopter Deck: Suitable for Sikorsky S91
Delivery: Malaysia/Singapore/China depends on order.
Fast Crew Boat (FCB)
Our Fast Crew Boat ranges from 50-80 pax, with speed from 18 knots up to 25 knots. Our principle FCB is specifically cater for marine crew and equipment transfer.
Class: ABS + A1 HSC + AMS "Crewboat". DPS-1
Vessel: 50M DP1 Fast Supply Intervention Vessel
Length: 50M
Accommodation: 75 pax
Speed: 25 knots
Year Built: 2014
Clear Deck Space: 200sqm
Delivery: Malaysia/Singapore
PRODUCTION EFFICIENCY / CONSTRUCTION PERIOD
Our combine resources of shipyards are capable of delivering up to 50 vessels annually depending on vessel size and complexity.
Below table shows typical construction period required for types of vessel.
Type of Vessel Typical Construction Period Required ( months)
AHTS 12 to 16
Platform Supply Vessel . 12 to 16
Multi Purpose Supply Vessel . 10 to 12
Landing Craft 10 to 12
Tug Boat 10 to 12
Barge 6
Anchor Handling Tug Supply Vessels (AHTS)
AHTS can perform towing, anchor handling operations and used for standby, rescue as well as emergency duties. The AHTS can also provide transportation and logistics services. Presently we offer 5,000,8,000,12,000 BHP vessels equipped with DP capabilities to cater for growing demand of deep water operations
Class: ABS
Length: 55M
BHP: 5150
Bollard Pull: 67 T - 150 T
Clear Deck Space: 330.6m2
AH/Towing Winch: 100T Pull/150T Brake
Delivery: Malaysia/Singapore/China depends on order.
Tug Boat
Tug Boat ranges from 1200HP-2000HP. They are suitable for harbor and cargo barge towing work.
Class: GL/100A5 MC
Flag: Singapore
Length: 23.5M
Draft: 2.7M
Engine: 1200BHP
Year Built: 2010
Delivery: Malaysia/Singapore/Indonesia
Barge
Barge range from 240ft-300ft that is suitable for equipment transfer
Class: GL/NK
Flag: Singapore
Length: 240ft
Breadth Moulded: 70ft
Depth Moulded: 16ft
Side Board Height: 2.45M
Deck Loading: 7.5T/m2
Year Built: 2011
Delivery: Malaysia/Singapore/Indonesia