We work with multiple yards and vessel owners in the Asia Pacific, to provide limitless options for our customers.

  1. Platform Supply Vessel (PSV)

  2. Anchor Handling Tug Supply (AHTS/AHT)

  3. Accommodation Work Barge (AWB)

  4. Fast Crew Boat (FCB)

  5. Tug and Barge

We provide:

  • Sales and Purchase

  • Chartering

  • New Build

tumblr_mjco89cUVY1rkz363o1_1280.jpg

Platform Supply vessel

PSV are designed for transportation of cargo to and from offshore oil platform and other offshore structure. The vessels can carry a combination of deck cargo and bulk cargo in tanks below deck. The vessels are equipped with firefighting capability and DP system

Class: ABS + A1 (E), Offshore Support Vessels, (Supply, FFV 1, OSR-C2) + AMS + ACCU + DPS-2, SPS

Length: 78M

Draft: 6.35M

Dead weight: 4,000T

Year Built: 2015

Clear Deck Space: 750m2

Delivery: Malaysia/Singapore/China depends on order.

Accommodation Work Barge/Vessel

AWB ranges from 150 pax to 300 pax equipped with a 300T Crane.

Class: ABS + A1 Barge, Accommodation & Work Barge Built to MODU Code

Length: 10M

Depth Moulded: 6.50M

Mooring System: 8 Point Mooring System, 4 x Double Drum AMHOIST AM77EF Diesel Driven Winches c/w spooling devices and tension meters.

Main Diesel Generators: 6 x 2800kw

Thruster: 4 x 560kw, 440/3/50

Crane: Pedestal Mounted - AMCLYDE Unit Mariner Model 35000 - Lifting Capacity 70T at 15m Radius, 150ft boom, 30ft above deck

Auxiliary Crane: 10T at 30ft radius

Clear Deck Space: 1728sqm2

Accommodation: 300 pax

Helicopter Deck: Suitable for Sikorsky S91

Delivery: Malaysia/Singapore/China depends on order.

Fast Crew Boat (FCB)

Our Fast Crew Boat ranges from 50-80 pax, with speed from 18 knots up to 25 knots. Our principle FCB is specifically cater for marine crew and equipment transfer.

Class: ABS + A1 HSC + AMS "Crewboat". DPS-1

Vessel: 50M DP1 Fast Supply Intervention Vessel

Length: 50M

Accommodation: 75 pax

Speed: 25 knots

Year Built: 2014

Clear Deck Space: 200sqm

Delivery: Malaysia/Singapore

PRODUCTION EFFICIENCY / CONSTRUCTION PERIOD

Our combine resources of shipyards are capable of delivering up to 50 vessels annually depending on vessel size and complexity.

Below table shows typical construction period required for types of vessel.

Type of Vessel Typical Construction Period Required ( months)

AHTS                                             12 to 16

Platform Supply Vessel .                  12 to 16

Multi Purpose Supply Vessel .         10 to 12

Landing Craft                                 10 to 12

Tug Boat                                        10 to 12

Barge                                                  6

 
tumblr_mlsetsKySj1rkz363o4_1280.jpg

Anchor Handling Tug Supply Vessels (AHTS)

AHTS can perform towing, anchor handling operations and used for standby, rescue as well as emergency duties. The AHTS can also provide transportation and logistics services. Presently we offer 5,000,8,000,12,000 BHP vessels equipped with DP capabilities to cater for growing demand of deep water operations

Class: ABS

Length: 55M

BHP: 5150

Bollard Pull: 67 T - 150 T

Clear Deck Space: 330.6m2

AH/Towing Winch: 100T Pull/150T Brake

Delivery: Malaysia/Singapore/China depends on order.

Tug Boat

Tug Boat ranges from 1200HP-2000HP. They are suitable for harbor and cargo barge towing work.

Class: GL/100A5 MC

Flag: Singapore

Length: 23.5M

Draft: 2.7M

Engine: 1200BHP

Year Built: 2010

Delivery: Malaysia/Singapore/Indonesia

Barge

Barge range from 240ft-300ft that is suitable for equipment transfer

Class: GL/NK

Flag: Singapore

Length: 240ft

Breadth Moulded: 70ft

Depth Moulded: 16ft

Side Board Height: 2.45M

Deck Loading: 7.5T/m2

Year Built: 2011

Delivery: Malaysia/Singapore/Indonesia